Plans, Reports, & Studies

This page contains plans, reports and other documents related to transportation planning at the Dixie Metropolitan Planning Organization or at state or federal agencies as they relate to the Dixie MPO area.

Latest Postings:

Newly posted documents have just been linked to on this page.
To view the new documents, please scroll down to the items tagged: “JUST POSTED!”

Current Plans
Dixie MPO:
Amendment #1 — 2015-2040 Regional Long Range Transportation Plan
2015-2040 Regional Long Range Transportation Plan
2015-2040 Active Transportation Plan
2012 DMPO Regional Transit Study
Washington Parkway Cost Benefit Study PDF file (large sized 30MB – Please be patient when downloading)
2011-2040 Regional Long-Range Transportation Plan
Coordinated Human Services Transportation Plan PDF file (1.32MB)
Utah Department of Transportation
 Utah’s Unified Transportation Plan 2011-2040 PDF file
Previous Plans
Interim Long-Range Plan PDF file (5.63MB)
2003 Short Range Transit Plan PDF file (637KB)
Reports & Studies
Dixie Bus Rapid Transit Feasibility Study – Final PDF file (1.98MB)
Dixie Regional Communications Study (DRAFT) PDF file (5.74MB)
Interactive Map that goes with the Study PDF file (1.44MB)
UDOT I-15 Washington County Corridor Study Web Link

Eastern Washington County Corridors Study 2013  PDF File (12.9MB)

UDOT Eastern Washington County Transportation Study Web Link
Dixie Regional Intelligent Transportation System (ITS) Architecture Final ReportPDF file (1.84MB)

Year 2000 Traffic Model Calibration Report PDF file (5.52MB)
Western Corridor North Study PDF file (7.65MB)
Western Corridor South Study PDF file (moderately sized 4.45MB compressed image quality – best choice for dial-up Internet users)
Western Corridor South Study PDF file (same as above but larger 18.99MB, uncompressed high quality – best for broadband Internet users)
Western Corridor South Study Video Presentation
(12.0MB Windows Media Video (WMV) format – best for broadband Internet users)
Other Documents and Presentations
Hurricane to Zion Canyon Transit Study – FINAL REPORT PDF file (3.0MB)
Dixie CTI Dixie Coordinated Transportation Implementation Tool PDF file (7.14MB)
Hinkley Drive Doc PDF file (10.46MB)
Functional Classification Presentation PDF file (313KB)
Statewide Transportation Improvement Program PDF file (1.485MB)
Southern Parkway Phase III Documents
08-05-09 DTAC Meeting Southern Parkway Horrocks Draft Report.pdf PDF file (3.90MB)
06-03-09 DTAC Meeting Southern Parkway Horrocks Presentation.pdf PDF file (2.06MB)
05-06-09 DTAC Meeting Southern Parkway Horrocks Presentation.pdf PDF file (2.84MB)
04-02-09 Future Roads Access Evaluation 2.pdf PDF file (460.30KB)
Washington Fields Road Option 1A – Property Owner’s Alignment PDF file (460.30KB)
04-01-09 Southern Parkway Horrocks Presentation.pdf PDF file (2.78MB)
03-23-2009 Roadway Concepts on Airport Parkway Development Property-Tyler Hoskins.pdf PDF file (734.02KB)
03-04-2009 Southern Parkway Phase 3 Transportation Study Presentation.pdf PDF file (1.01MB)
02-10-2009 Southern Parkway Phase 3 Transportation Study PDF file (608.91KB)
South Mountain Plan.pdf PDF file (775.62KB)
Roadway Plan 01-21-2009 and CoverLetter.pdf PDF file (1.07MB)
East and West Airport Master Plan Study PDF file (26.57MB) NOTE: Very Large File!
Southern Parkway Funding, Financing Presentation – December 17, 2008 Task Force Meeting PDF file (2.74MB)
Unified Planning Work Program
Unified Planning Work Program FY2010-11 (July 1, 2009-June 30, 2011) PDF file (1.47MB)