Plans, Reports, & Studies

This page contains plans, reports and other documents related to transportation planning at the Dixie Metropolitan Planning Organization or at state or federal agencies, as they relate to the Dixie MPO planning area.

Current Plans
Dixie MPO:
 St. George to Springdale Public Transit Feasibility Study 
2019-2050 Regional Transportation Plan 
2015-2040 Active Transportation Plan

2012 DMPO Regional Transit Study

MP 11 FEIS

Previous Plans
Dixie MPO:
2015-2040 Regional Long-Range Transportation Plan
2015-2040 Regional Long-Range Transportation Plan (Amendment #1)
2015-2040 Regional Long-Range Transportation Plan (Amendment #2)
2011-2040 Regional Long-Range Transportation Plan
SunTran Current Plan
Washington Parkway Cost Benefit Study PDF file (large sized 30MB – Please be patient when downloading)

 

Washington Parkway — Integration of East-West Transportation Needs with Conservation Objectives for Desert Tortoise in Washington County, Utah PDF file (large sized 30MB – Please be patient when downloading)

Coordinated Human Services Transportation Plan PDF file (1.32MB)

Reports & Studies
Dixie Bus Rapid Transit Feasibility Study – Final PDF file (1.98MB)
Dixie Regional Communications Study (DRAFT) PDF file (5.74MB)
Interactive Map that goes with the Study PDF file (1.44MB)
UDOT I-15 Washington County Corridor Study Web Link

 

Eastern Washington County Corridors Study 2013  PDF File (12.9MB)

UDOT Eastern Washington County Transportation Study Web Link
Dixie Regional Intelligent Transportation System (ITS) Architecture Final ReportPDF file (1.84MB)

 

Year 2000 Traffic Model Calibration Report PDF file (5.52MB)
Western Corridor North Study PDF file (7.65MB)
Western Corridor South Study PDF file (moderately sized 4.45MB compressed image quality – best choice for dial-up Internet users)
Western Corridor South Study PDF file (same as above but larger 18.99MB, uncompressed high quality – best for broadband Internet users)
 
Other Documents and Presentations
Hurricane to Zion Canyon Transit Study – FINAL REPORT PDF file (3.0MB)
Dixie CTI Dixie Coordinated Transportation Implementation Tool PDF file (7.14MB)
Functional Classification Presentation PDF file (313KB)
Statewide Transportation Improvement Program PDF file (1.485MB)
 SR-7 (Southern Parkway); Sand Hollow to SR-9
Southern Parkway PDF file (3.90MB)